Username
Password
Home
Forgotten Password?
Register Now
Site Map
THE UK CONSTRUCTION INDUSTRY'S MOST UP TO DATE ARTICLE SEARCH |
Search:
Advanced Search
LAFARGE PLASTERBOARD IN NEW SHOPPING MALL
Lafarge Plasterboard Ltd
22/08/2007
Lafarge Plasterboard has supplied all the drylining requirements for the recently opened Jackson Square shopping centre extension in Bishops Stortford.
Conneely Drylining has installed Lafarge’s Firecheck high performance wall board throughout the 100,000 sq ft retail mall including the very complex high level ceiling construction.
The Wilson Bowden development, designed by architects Broadway Malyan, features 8.5m high partitions which were constructed using Lafarge’s 146mm C Stud system to achieve the necessary height and stability. These also feature telescopic deflection heads with fire umbrellas constructed on site to allow for the anticipated 55mm downward deflection.
The structural steel columns in the shopping centre were given the necessary fire protection using Lafarge’s Cormet column and beam clip system. This is a very simple to fix system which can provide up to 180 minutes fire resistance. It uses a special clip in conjunction with metal angles and channels to provide a strong, rigid metal structure to which the Firecheck board can be applied.
Conneely Drylining endorses the system because it allows the plasterboard to fit tightly around the columns giving a more durable encasement.
Broadway Malyan specified Lafarge because of the proven benefits of the plasterboard systems and because of the support available from the regional Technical Specification Manager who was able to advise on the best drylining solutions to meet the technical requirements of the project and who was also regularly available on site to provide technical support.
Lafarge and Conneely Drylining also supplied all the plasterboard requirements for the adjoining development of 95 new build apartments at Jackson Square.
Email article
Print article
Was this article useful to you?
Recommend it:
Average (0 votes)
View similar articles:
Plasterboard
,
Steel
,
Flats & Apartments
,
Retail
People who viewed this article were also interested in
Subject
Supplier
Date Published
Jenkins, Bakers of Distinction since 1921 Kemtile, Floo...
Kemtile
18/06/2007
Somero and Seamless Floors make a great team
Somero Enterprises Ltd
25/06/2007
More Floor At Colmore
Kingspan Metl-Con
10/08/2007
Two revolutionary systems to debut for Icopal’s acousti...
Icopal
13/08/2007
Icopal turns in an Olympic performance
Icopal
24/08/2007
Other articles from Lafarge Plasterboard Ltd
Subject
Date Published
Lafarge Plasterboard In New Secondary School
06/11/2007
Lafarge tells contractors ‘you can’t ignore it anymore’
08/08/2007
Lafarge has supplied plasterboard for the Parochial Chu...
25/06/2007
Lafarge Plasterboard chosen for new cine UK complex
20/06/2007
Click here
to report a mis-classified article
Click here
to report an abusive or defamatory article
© CMP information Ltd 2007
Terms and Conditions
Privacy Policy