Username
Password
Home
Forgotten Password?
Register Now
Site Map
THE UK CONSTRUCTION INDUSTRY'S MOST UP TO DATE ARTICLE SEARCH |
Search:
Advanced Search
TESTED FROM THE KICK-OFF
ACO Building Drainage
11/01/2006
ACO drainage system in play at Emirates Stadium opening
The first game at Arsenal's spectacular new 60,000 seater Emirates Stadium was greeted with an untimely heavy downpour. Succeeding in keeping the critical perimeter pedestrian areas around the new entrances and turnstiles free from standing water, was a channel drainage system designed by specialist, ACO Building Drainage.
Manufactured entirely from stainless steel, the new system meets both the high visual and performance specifications set by the architects and the club.
Email article
Print article
Was this article useful to you?
Recommend it:
Average (3 votes)
View similar articles:
Clay
,
PVC
,
Treatment Systems
,
Access Chambers
,
Steel
,
Churches & Places of Worship
,
Other
People who viewed this article were also interested in
Subject
Supplier
Date Published
The New Convir FL Series of High Performance Fibre-Opti...
Calex Electronics Ltd
27/09/2006
Environmental Chain of Custody Assured
Puhos Board (UK) Limited
28/09/2006
Norbain catalogue gets the thumbs up from customers
Norbain SD Ltd
29/09/2006
The ROTOR and OMNI as illustrated are just two of a sel...
Peerless Designs
29/09/2006
New literature
HARTING
04/10/2006
Other articles from ACO Building Drainage
Subject
Date Published
ACO takes on the drainage Burden
24/04/2008
New ACO floor gullies provide the safe option
03/04/2008
Fast-Track Drainage
07/02/2008
Wetrooms and accessible living Andrew Lee, Product Mana...
06/11/2007
An academic solution
25/09/2007
Click here
to report a mis-classified article
Click here
to report an abusive or defamatory article
© CMP information Ltd 2007
Terms and Conditions
Privacy Policy