Advanced Search
 
building space image
RAPID ROOF INSTALLATION
building
U-Roof Ltd
11/08/2008
 
U-Roof is pleased to announce the successful installation of it latest project, as with most modern construction sites access can be constricted and the site itself is often tight for space. After assessing the construction details and site requirements it was decided to use the U-Roof system but to assemble the frames in situ rather than using a modular installation method.
Andrew Kay the contractor for the project describes the installation procedure, "By first using the U-Roof Joist profile and following prepared drawings the positions were marked out on the wall plate and fixed into position with No.10 woodscrews. Decking boards were then added to provide a working platform and the internal floor of the structure. Internal cheek walls were erected to provide support and set the pitch angle of the main panels which were lifted in front of the building face at the front and rear and simply bolted into position. The system was adjustable on site to cover for building tolerances etc and also included prepared opening for the windows. The design of the joist system and connection brackets to allow correct positioning of the stairs and extra supports under internal walls was again a simple bolt connection which again improved installation time".
Using self tapping screws and bolted connections for the structure provides a completely ridged unit which the insulation, battens etc can be fixed to in a traditional way. With the elements being pre designed and pre fabricated to suit the design, installation time has been reduced and accuracy for follow on trades increased. For this project elements were assembled on site, however they can be assembled in modular form and lifted into place to increase installation time further.
Please refer to www.u-roof.com for further information and images of the installation.
building
 
View similar articles:  
building
   
CommunityArticles People who viewed this article were also interested inCommunityArticles   CommunityArticles
SupplierArticles Other articles from U-Roof LtdSupplierArticles   SupplierArticles
 SubjectDate Published
Applying MMC To The Roofing Element



16/06/2008
Miscategorized Article Miscategorized Article Miscategorized Article
 
Click hereto report a mis-classified article
construction space image
Miscategorized Article Miscategorized Article Miscategorized Article
Article Report Abuse Article Report Abuse Article Report Abuse
 
Click hereto report an abusive or defamatory article
Report Article Abuse
Report Article Abuse Report Article Abuse Report Article Abuse
 
© CMP information Ltd 2007
Terms and Conditions  Privacy Policy