|
| | | | |
|
 | | AN EPIC CONSTRUCTION |  | | Flex Connectors Limited | | 21/05/2008 | | | A new exhibition and conference centre, constructed using the latest green building technologies, utilises lighting connection and control products from Flex Connectors’ flex 7 range throughout the venue.
With energy efficiency vital to achieving a low carbon footprint for the EPIC Centre at Lincolnshire Showground, contractors GRS Electrical installed flex 7 networked occupancy sensors, connection units and pre-wired leads to ensure that all lighting was sensor-controlled.
The automatic switching off of lights in unused areas and the use of daylight-linked dimming to make the most of the available daylight will help the Centre make considerable savings on the energy consumed by lighting.
The environmentally-conscious EPIC Centre is the UK’s largest purpose-built venue of this type and aims to increase awareness of climate change and encourage individuals and businesses to recognise their ability to make a difference.
The Centre has been designed to incorporate multiple functions, including a visitor centre, educational hub, office, exhibition hall, meeting place, concert venue and trade show site and agricultural environment. |  |
|
| | | View similar articles: | |  |
| | | |
|
 | People who viewed this article were also interested in |  | |  |
|
 | Other articles from Flex Connectors Limited |  | |  |
|